IT relocation: move premises without stopping the business

We manage the IT side of your move, from carrier links to order early to the first morning when everyone finds their workstation. Our consultants work in Rouen, Normandy and Paris, in both your old and new premises.

Technician connecting cables to a network switch in a rack during an installation

New premises prepared

Technical survey, cabling, comms room, power, Wi-Fi and carrier links checked before the teams arrive.

A cutover plan

Inventory of what moves, order of dismantling and reassembly, labelling, a rollback scenario.

Contributors coordinated

Removal firm, cabling contractor, carriers, integrator and facilities follow a single schedule, steered by one point of contact.

A supported restart

Full testing before users arrive and on-site support on the first day in the new premises.

IT, the blind spot of many moves

The lease is signed, the layout is chosen, the removal firm is booked. Then, a few weeks before the date, someone asks: will the fibre be delivered on time? The comms room has no air conditioning, the cabling does not match the office layout, the Wi-Fi access points were forgotten, telephony depends on a number that has to be ported to a new carrier. On the first morning in the new premises, part of the team cannot work.

IT is the most invisible part of a move, and often the longest to prepare. Carrier links have delivery times that cannot be negotiated. And in most municipalities in France, it has no longer been possible to subscribe to a new copper network connection since 31 January 2026, according to the regulator Arcep. New premises must therefore be connected another way, most often by fibre, and that needs planning ahead.

Our service covers everything that must follow your teams

  • The technical survey of the new premises: cabling, comms room, electricity, air conditioning, radio coverage.
  • Ordering and tracking carrier links, with a backup link if the business requires it.
  • Network design for the new site: switches, VLANs, Wi-Fi, guest access.
  • The inventory of everything that moves: servers, racks, devices, printers, telephony, specialist equipment.
  • The cutover plan: order of dismantling, transport, reassembly, tests, rollback.
  • Coordination of all contributors around a single schedule.
  • Support on site on restart day.

We do not forget the discreet equipment, often discovered at the last minute: access control, alarm, CCTV, digital signage, payment terminals. Each has its own connection constraints, and sometimes its own supplier to notify.

This type of project draws on several of our skills: infrastructure project management to coordinate, Wi-Fi audit and deployment to cover the new spaces, and multi-site interconnection when the old and new sites must coexist for a while.

A move is also a rare chance to review what you would not dare to touch in normal times: a flat network, an ageing server room, servers that could move to the cloud, telephony to modernise. We help you tell what deserves attention at this point from what would needlessly weigh down the project.

An IT relocation in six steps

  1. Scoping. Target date, scope, business constraints, contacts, budget.
  2. Survey and requirements. Technical survey of the new premises, needs department by department.
  3. Orders. Carrier links, equipment and cabling work, started as early as possible.
  4. Preparation. Configuration of the target network, tests, labelling, communication to users.
  5. Cutover. Dismantling, transport, reassembly and tests, outside working hours.
  6. Restart. On-site support on the first day, clearing of snags, review.

A backward schedule, a cutover plan and an accepted site

  • An IT backward schedule anchored on the move-in date.
  • Specifications for cabling and carrier links.
  • A labelled inventory of everything that moves.
  • A detailed cutover plan, with its rollback scenario.
  • An acceptance report for the new site and its network documentation.

Present in the old building and the new one

A move is lived on the ground, and that is where our consultants work. Techmood is based in Le Petit-Quevilly, in the Rouen metropolitan area, and works on assignment at client sites in Rouen, Le Havre, Évreux and Paris. Our consultants can follow the cutover from start to finish, from dismantling in the old building to going live in the new one.

Our compass remains the user. On the first morning, everyone should find their workstation, printer, Wi-Fi and files as if they had never moved. For Wi-Fi in the new spaces, our article on business Wi-Fi audits sets out what to check.

Learn more about our IT project managers and our project management expertise.

A move on the horizon? Let’s prepare it together.

Frequently asked questions

When should IT preparation for a move start?

As early as possible, as soon as the new premises are known. Carrier links, cabling and fitting out the comms room involve lead times that are not in your hands. We build the backward schedule from the move-in date.

Will users lose working days?

The goal is that they lose none. The cutover is planned for the end of the week or outside working hours, and everything is tested before they arrive. On the first day, support is on site to sort out the last details.

What do we need to get started?

The plans of the new premises, the intended move-in date, the list of carrier contracts and a contact in facilities management. We complete the IT inventory when the assignment starts.

Can you manage a move between Rouen and Paris?

Yes. Our consultants work on assignment in Rouen, along the Seine corridor and in Paris. We can be present at the old site and the new one, which matters a great deal on cutover day.