Business Wi-Fi audit and deployment, measured in the field

Our network consultants measure your Wi-Fi on site, identify the real cause of dropouts and design coverage that suits your buildings. We then support the rollout of access points through to acceptance, in Rouen, Normandy and Paris.

Technician plugging white network cables into a switch installed in a rack

On-site measurements

Coverage, throughput and roaming surveys with real devices, and spectrum analysis when interference is suspected.

Root-cause diagnosis

Coverage, capacity or interference: we tell the three apart to fix the right problem, often through configuration before hardware.

Placement plan

Location and settings of each access point, choice of Wi-Fi standard, cabling and Power over Ethernet requirements.

Deployment and acceptance

Installation coordinated with your teams and your contractors, then validation measurements on site, zone by zone.

Wi-Fi that keeps dropping wears everyone’s patience thin

Video calls that cut out, areas where the laptop loses the network, the warehouse scanner that disconnects between two aisles, slowdowns at the time everyone arrives. The usual reflex is to add an access point where it hurts. Sometimes it helps, sometimes it makes things worse, because two access points too close together on the same channel interfere with each other.

A Wi-Fi problem almost always has one of three origins: insufficient coverage, exceeded capacity or interference. Each calls for a different response. Without measurement, you treat the symptom at random, and sometimes buy hardware that fixes nothing. The devices themselves play a part: an old scanner, or a laptop whose driver was never updated, can slow down every device connected to the same access point.

Our article on business Wi-Fi audits explains these mechanisms in detail and helps you spot the warning signs. This page presents the service: what we do at your premises, and what you get at the end.

Our Wi-Fi audit runs from on-site measurement to access point deployment

  • Gathering usage: number of users per zone, critical applications, devices, telephony, industrial equipment.
  • On-site measurements: coverage, signal-to-noise ratio, throughput, roaming, channel occupancy.
  • Configuration review: channels, transmit power, channel width, minimum data rates, security, guest network.
  • Target design: access point placement plan, recommended standard, cabling and PoE power needs.
  • Deployment support: specification, coordination of the installation, configuration.
  • Acceptance: new measurements on site to check that each zone meets the need.

For a new building or a refit, we first work from floor plans, even before the move, then verify on site once partitions and furniture are in place. A plan-based prediction gives a starting point; only measurement validates the result.

Visitor access is part of the study. It must stay simple for them and watertight for you, as our article on managing guest access explains. And Wi-Fi is never better than the wired network behind it: switches and uplinks fall under our LAN redesign and switching service.

Six steps, from measurement to acceptance

  1. Preparation. Building plans, inventory of existing access points, incident history, usage by zone.
  2. Measurement campaign. On-site surveys, at times representative of activity.
  3. Analysis. Coverage maps, identified causes, configuration gaps.
  4. Recommendations. Immediate settings first, then placement changes, and hardware last if needed.
  5. Deployment. Installation and configuration of the access points, coordinated with your teams and contractors.
  6. Acceptance. Validation measurements and final adjustments.

Maps, a placement plan and a measured acceptance

  • An audit report with coverage maps of the existing setup.
  • The list of identified causes, zone by zone.
  • An access point placement plan, with their settings.
  • A prioritised roadmap: what is fixed through configuration, what needs hardware.
  • An acceptance report after deployment, backed by maps.

Network consultants in the field, from Rouen to Paris

A Wi-Fi audit is done in the field, and that is where our consultants work. Based in Le Petit-Quevilly, in the Rouen metropolitan area, Techmood sends them on assignment to client sites in Rouen, Le Havre, Évreux and Paris. They know the region’s buildings, from old structures with thick walls to warehouses whose racking changes how signals propagate, as well as the office floors of the Paris region (Île-de-France) where neighbouring networks crowd the airwaves.

Our recommendations start from your usage and your current installation. Replacing hardware comes last, when configuration is no longer enough. And we keep the user at the centre: good Wi-Fi is the kind nobody thinks about.

Discover the profile of our network engineers and our full network expertise.

Dropouts to understand, or a new site to cover? Let’s schedule a conversation.

Frequently asked questions

How long does a Wi-Fi audit take?

It depends on the floor area, the number of buildings and access constraints. We set the duration after seeing the plans and discussing your usage. On an active site, we schedule measurements at representative times, for example when a meeting room is full.

Do the measurements disrupt users?

No. The surveys are carried out by walking through the premises with a computer and measurement tools, without shutting down the network. Only certain configuration checks may need a short slot, which we agree with you in advance.

Should we move to Wi-Fi 6E or Wi-Fi 7?

Not necessarily. These standards use the 6 GHz band, open to Wi-Fi in Europe between 5945 and 6425 MHz, but only compatible devices benefit, and the band requires recent security mechanisms such as WPA3. We look at your device fleet and the expected lifetime of the installation before recommending a standard.

Do you work in Paris and on industrial sites?

Yes. Our consultants work on assignment in Rouen, Le Havre, Évreux and Paris, in multi-storey offices as well as in warehouses and workshops. A Wi-Fi audit is always done on site, because a floor-plan simulation is not enough.